CertsPoint
See all results for ""
Exams About Us
Sign In Get Started
Exam Overview
Exam Code CTS
Exam Name Certified Technology Specialist
Vendor Axis Communications
Total Questions 254
Last Updated 26-Oct, 2026
Why CertsPoint?
  • Latest & Verified Questions
  • Detailed Explanations
  • Regular Updates
  • Full-Length Practice Tests
  • Boost Your Exam Confidence

PDF Study Materials

Downloadable guides and resources

Practice Tests

Full-length tests with real exam experience

Progress Tracking

Monitor your performance and improvement

Study Anywhere

Access on desktop, tablet, and mobile

Excellent
4.6 (398 Up Votes)
Secure Payment Privacy Protected Money Back Guarantee

Free CTS Practice Questions

Explore 6 free practice questions for the Axis Communications CTS exam and review the answers and explanations to support your preparation.

  1. Question 1

    Single answer

    When creating an estimate for a request for proposal (RFP), what is the FIRST tiling that should be done? 

    • Option A:
      obtain the costs
      Correct
    • Option B:
      create the submittal
      Correct
    • Option C:
      schedule a site visit
      Correct
    • Option D:
      read the project description 
      Correct
    Show Answer & Explanation Hide Answer & Explanation

    Correct Answer: D

    Explanation

    The first step in creating an estimate for an RFP is to read the project description thoroughly. This ensures that you fully understand the scope, requirements, and objectives of the project. By doing so, you can accurately determine what is needed, identify potential challenges, and make informed decisions on costs, resources, and scheduling. Starting with a clear understanding of the project description sets
  2. Question 2

    Single answer

    When connecting a condenser microphone, what MUST be included in die system design for it to operate?

    • Option A:
      mixer
      Correct
    • Option B:
      stand
      Correct
    • Option C:
      transmitter
      Correct
    • Option D:
      power source 
      Correct
    Show Answer & Explanation Hide Answer & Explanation

    Correct Answer: D

    Explanation

    A condenser microphone requires a power source to operate because it uses an electrostatic principle to convert sound into an electrical signal. This power is typically provided by phantom power supplied by a mixer or an audio interface. Without this power source, the condenser microphone will not function. It is crucial to include a power source in the system design to ensure the microphone operates correctly. Reference: Axis Communications - Audio Equipment Integration Audio Engineering Society (AES) Standards 
  3. Question 3

    Single answer

    During a routine service visit, an engineer notices an LED indicator on a projector's front panel blinking regularly. What should be done? 

    • Option A:
      consult the projector's manual 
      Correct
    • Option B:
      replace the projector's lamp and filters
      Correct
    • Option C:
      disregard because the projector is operational
      Correct
    • Option D:
      remove the power cable and re-boot the projector
      Correct
    Show Answer & Explanation Hide Answer & Explanation

    Correct Answer: A

  4. Question 4

    Single answer

    Assuming that the speakers in the picture on the LEFT are 8 Q drivers, what is the impedance of the speaker system on the left?

    • Option A:
      2Q
      Correct
    • Option B:
       4Q
      Correct
    • Option C:
      8Q
      Correct
    • Option D:
      16Q
      Correct
    Show Answer & Explanation Hide Answer & Explanation

    Correct Answer: A

    Explanation

    Assuming the speakers on the left are 8Ω drivers and they are connected in parallel, the total impedance ZtZ_tZt can be calculated using the formula for parallel resistance: Zt1=Z11+Z21 For two 8Ω speakers in parallel: 1Zt=18+18=28=14\frac{1}{Z_t} = \frac{1}{8} + \frac{1}{8} = \frac{2}{8} = \frac{1}{4}Zt1=81+81=82=41 Therefore, Zt=4ΩZ_t = 4ΩZt=4Ω If the wiring in the diagram shows two pairs of 8Ω speakers connected in parallel, the total impedance is 4Ω for each pair, and if these pairs are then connected in parallel again, the final impedance is: 1Zt=14+14=24=12\frac{1}{Z_t} = \frac{1}{4} + \frac{1}{4} = \frac{2}{4} = \frac{1}{2}Zt1=41+41=42=21 Thus, the total impedance is 2Ω. Reference: Axis Communications - Audio System Design Basic Electrical Engineering Textbooks 
  5. Question 5

    Single answer

    As the height of a character increases on a display.

    • Option A:
      legibility increases.
      Correct
    • Option B:
      legibility decreases.
      Correct
    • Option C:
      brightness increases.
      Correct
    • Option D:
      brightness decreases. 
      Correct
    Show Answer & Explanation Hide Answer & Explanation

    Correct Answer: A

    Explanation

    Legibility of text on a display is directly related to the height of the characters. As the height increases, the text becomes easier to read from a distance because the characters are larger and more distinct. This is a fundamental principle in design and ergonomics, ensuring that text is easily readable for users in various viewing conditions. This is particularly important in contexts such as digital signage, user interfaces, and public information displays. Reference: Axis Communications - Display and Readability Guidelines Human-Computer Interaction Textbooks  
  6. Question 6

    Single answer

    When doing a site survey, it is MOST IMPORTANT to consider the client's

    • Option A:
      budget.
      Correct
    • Option B:
      timeline.
      Correct
    • Option C:
      expectations.
      Correct
    • Option D:
      knowledge of technology.
      Correct
    Show Answer & Explanation Hide Answer & Explanation

    Correct Answer: C

    Explanation

    When conducting a site survey, understanding and considering the client's expectations is paramount. This involves determining what the client hopes to achieve with the installation, their specific requirements, and any particular preferences they may have. By aligning the survey with the client's expectations, the surveyor can ensure that the final installation meets or exceeds the client's needs and satisfaction. This principle is well-documented in project management and client relations literature, emphasizing the importance of clear communication and understanding of client objectives at the onset of a project. Reference: Axis Communications - Site Survey Guidelines Project Management Institute (PMI) Standards