Exam Overview
| Exam Code | UiPath-TAEPv1 |
| Exam Name | UiPath Test Automation Engineer Professional v1.0 Exam |
| Vendor | UiPath |
| Total Questions | 110 |
| Last Updated | 26-Oct, 2026 |
Why CertsPoint?
- Latest & Verified Questions
- Detailed Explanations
- Regular Updates
- Full-Length Practice Tests
- Boost Your Exam Confidence
PDF Study Materials
Downloadable guides and resources
Practice Tests
Full-length tests with real exam experience
Progress Tracking
Monitor your performance and improvement
Study Anywhere
Access on desktop, tablet, and mobile
Secure Payment
Privacy Protected
Money Back Guarantee
Free UiPath-TAEPv1 Practice Questions
Explore 5 free practice questions for the UiPath UiPath-TAEPv1 exam and review the answers and explanations to support your preparation.
-
Question 1
Single answerWhere should be navigated in UiPath Test Manager in order to configure a new Jira connection?
-
Option A:Correct
Navigate to the External Connections tab within Admin Settings.
-
Option B:Correct
Navigate to the Integrations tab within Admin Settings.
-
Option C:Correct
Navigate to the Connection tab within Project Settings.
-
Option D:Correct
Navigate to the Integration tab within Project Settings
Show Answer & Explanation Hide Answer & Explanation
Correct Answer: B
Explanation
To configure a new Jira connection in UiPath Test Manager, you need to navigate to the Integrations
tab within Admin Settings. This is where external ALM tools like Jira can be connected and managed
centrally. -
-
Question 2
Single answerWhere are Postman collection endpoint activities found after being imported into a Studio library?
-
Option A:Correct
In the Projects tab, under the namespace of the imported Postman collection.
-
Option B:Correct
In the Activities tab, under the namespace that you have set.
-
Option C:Correct
In the Debug tab, within the testing activities pack.
-
Option D:Correct
In the Activities tab, under the Postman imported libraries list.
Show Answer & Explanation Hide Answer & Explanation
Correct Answer: B
Explanation
After importing a Postman collection into a Studio library, the endpoint activities appear in the
Activities tab, under the namespace that you have set during the import process. This makes them
reusable across workflows. -
-
Question 3
Single answerWhat are the key features of UiPath Test Manager and its integration with ALM solutions, facilitated
by UiPath Test Manager Connect?-
Option A:Correct
UiPath Test Manager Connect offers a one-way synchronization of objects and supports a limited
number of ALM tools. -
Option B:Correct
UiPath Test Manager is only compatible with ALM solutions for defect management, and the
integration is facilitated by an external provider. -
Option C:Correct
UiPath Test Manager is compatible with leading ALM solutions, and the UiPath Test Manager
Connect, provided by Planview, ensures bidirectional synchronization for seamless data exchange. -
Option D:Correct
UiPath Test Manager excludes agile planning and requirement management, and the integration is
facilitated by UiPath itself.
Show Answer & Explanation Hide Answer & Explanation
Correct Answer: C
Explanation
UiPath Test Manager integrates with leading ALM solutions, and the UiPath Test Manager Connect
(provided by Planview) enables bidirectional synchronization for requirements, defects, test cases,
and results—ensuring seamless and real-time data exchange between UiPath and ALM platforms. -
-
Question 4
Single answerWhen is it necessary to utilize the Mobile Device Manager?
-
Option A:Correct
Both at design-time and at run-time.
-
Option B:Correct
Never
-
Option C:Correct
At run-time.
-
Option D:Correct
At design-time.
Show Answer & Explanation Hide Answer & Explanation
Correct Answer: A
Explanation
The Mobile Device Manager is required both at design-time and run-time when working with mobile
automation in UiPath. At design-time, it connects Studio to mobile devices for building workflows. At
run-time, it enables execution of mobile automation on those devices. -
-
Question 5
Single answerWhat is the purpose of UiPath Test Manager Hub?
-
Option A:Correct
Test execution in a scheduled manner or build-driven through a CI/CD pipeline.
-
Option B:Correct
Integration between UiPath Test Suite and third-party ALM tools.
-
Option C:Correct
Reporting and dashboards for test results.
-
Option D:Correct
Management of the testing process.
Show Answer & Explanation Hide Answer & Explanation
Correct Answer: B
Explanation
The UiPath Test Manager Hub acts as the integration point between UiPath Test Suite
and third-party
ALM tools (like Jira, Azure DevOps). It enables synchronization of requirements, defects, test results,
and assignments, supporting seamless lifecycle management. -